General Installation Guidelines
Akril Panel is simple to install using construction adhesive and, if desired, double-sided tape.
It can be fixed directly to an existing sealed or unsealed wall lining, such as plaster board.
Always follow the adhesive manufacturer’s instructions.
Akril Panel is easy to clean, impervious to moisture and will not support mould growth.
Note: throughout this brochure “wet” and “dry” areas will be referred to.
A wet area is defined as any area within a building supplied with water e.g. bathrooms, ensuites, toilets, kitchens, shower rooms, laundries and changing rooms in fact any area where water services are supplied.